Category Archives: Chickamauga

Wildfire information and resources

Wildfire information and warnings

ARCGIS Wildfire Maphttps://www.arcgis.com/home/webmap/viewer.html?webmap=df8bcc10430f48878b01c96e907a1fc3
(satellite early warning hotspots, fire area, and NWS warnings and real time weather station/wind direction)

Wildfires Near Me: https://wildfiresnearme.wfmrda.com/
( map/app with Twitter reports and managed incidents)

InciWeb: http://inciweb.nwcg.gov
(National Forest & multi-agency managed fire incidents)

North Carolina Joint Information Center (JIC): http://ncjic.blogspot.com
(public information office for the 2016 fires)

National Interagency Fire Center (NIFC): http://gacc.nifc.gov/

Southern Area Coordination Center (NIFC SACC)http://gacc.nifc.gov/sacc/

Wildfire Today:
http://wildfiretoday.com
(news and opinion from an NIFC & aviation veteran)


Recent Wildfires near East Chickamauga:

  • Long Hollow Rd (November)
    • small brush fire on both sides of the road
  • Chickamauga/Chattanooga NMP (November)
    • small grass fire
  • Strawberry Mtn (October-November)
    • medium wildfire

Zoning and traffic considerations for the Twin Cedars / Hwy 27 Intersection

Catoosa County Planning Commission is considering a re-zoning and subdivision request for an 11 acre parcel on the southwest corner of Twin Cedars Rd and US Hwy 27. There is an additional plan for major reconstruction of the intersection, with turn lanes and traffic signals. None of this is favorable for local residents and property owners, nor is it necessary.

Zoning and Land Use of the Nevins parcel

County commercial land use and property zoning code is worded to favor promotion of intra-county commerce and residents’ convenience. There is no justification on those grounds for commercial development of the Nevins parcel. It is situated in an extreme corner of the county, with mainly agricultural and large residential parcels. Therefore, commercial development would not serve a large number of Catoosa residents.

Twin Cedars & US Hwy 27 area, showing the Nevins property
Twin Cedars & US Hwy 27 area, showing the Nevins property

This corner of Catoosa can be thought of as “Watoosa,” because it is a remote corner of the county, surrounded and served by Walker County commercial and manufacturing zones.

Rock Spring, Ringgold, Chickamauga, Fort Oglethorpe and Lafayette are nearby towns that provide for any commercial need.

There are already multiple commercial and manufacturing zones serving the area (though most are in Walker): Fieldstone Farms has small retail, office and dining. Red Belt/27/Lafayette Rd is a large commercial zone with all commercial (retail, dining, lodging, office) and heavy manufacturing uses. Four Corners (Red Belt/Long Hollow/Burning Bush/Three Notch) has light manufacturing, multi-unit, and small retail.

Traffic Safety and Planning for Twin Cedars Rd and Lee Clarkson Rd at Hwy 27

The Twin Cedars and US Highway 27 intersection is dangerous. Relatively heavy and fast traffic on 27, with poor lines of sight due to hills, dips and turns, makes left turns and crossing from the secondary roads very dangerous. Numerous accidents and fatalities support the argument for traffic controls at the intersection.

The current, narrow rights of way on Twin Cedars and Lee Clarkson cannot handle tractor-trailers, and will not accommodate turn lanes. Common thought favors expensive and extensive intersection improvements that will require re-zoning, property condemnation, state and county right-of-way expansion and heavy construction. However, none of this is necessary, and there is an existing and reasonable alternative.

There is no need for a traffic signal at Twin Cedars/27. There is no need for turn lanes on Twin Cedars and Lee Clarkson. I use that intersection every weekday for my commutes, and nearly every weekend to visit Chickamauga. However, I never turn left, and I never directly cross 27.

The safest current method is to never turn left, and never directly cross 27 from Twin Cedars or Lee Clarkson. It is much safer to only turn right from Twin Cedars and Lee Clarkson. That may sound stupid and restrictive, but it makes sense if you use Farming Rock Rd to make left turns. Farming Rock has much better lines of sight on 27, and has much better ingress/egress for turns.

To turn left toward Rock Spring from Twin Cedars:

  • either Use Farming Rock and Lee Clarkson,
  • or Take Long Hollow and Kay Conley. Those routes may add one minute to the drive time, but they are far safer.

To cross 27 from Twin Cedars:

  • Turn right on 27, left on Farming Rock, right on Lee Clarkson.

To cross 27 from Lee Clarkson:

  • Turn left on Farming Rock, right on 27, left on Twin Cedars.

My suggestion for intersection improvement:

Add signage, striping and pavement arrows only.

  • Dangerous Intersection signs on Hwy 27
  • Right Turn Only on Twin Cedars
  • Right Turn Only on Lee Clarkson
  • Detour on Farming Rock Rd to Lee Clarkson Rd & vice-versa
  • Vehicle weight/axle restrictions (agricultural exception)

Why make Twin Cedars Rd and Lee Clarkson Rd “right turn only”?

This alternative would be a tiny fraction of the monetary and political costs of major construction for lanes and signals. It would solve the safety issues, and improve traffic flow. US Highway 27 traffic could still turn left, but Twin Cedars and Lee Clarkson should be made “right turn only” onto Hwy 27.

Image credit: qPublic.net

Georgia Power (Oglethorpe Power) and TVA eminent domain process

Property owners who have been approached by Tennessee Valley Authority (TVA), Georgia Power, North Georgia Electric Membership Corporation (NGEMC), Georgia Transmission Corporation, Oglethorpe Power Corporation or a government representative, and offered any amount for purchase of easement or real estate, have experienced the first step in a process which may end in exercise of eminent domain: the condemnation and compulsory forfeiture or sale of the easement or property.

Example: Church is offered $1.00 (one dollar) for a portion of church property, to build a transmission facility. Church members reject the offer. Power corporation counters with a more realistic monetary offer. The church again refuses. The property is condemned, seized and sold to the power corporation at “fair market value”. Real estate, appraisal or legal fees incurred by the church to affect or resist this process are not recoverable.

While the owners of property on which transmission facilities or lines would be located may receive “fair market value” for the use or loss of their property, nearby property owners will not receive compensation for effects of the project on their property value.

Judging by recent projects, TVA, Georgia Power or Oglethorpe Power eminent domain process will entail a few hours of public meetings, likely on a single day. This will be the primary forum for voicing concerns and objections to the proposed project and the eminent domain process.

How much is your property worth? If the Georgia Department of Transportation (DOT), TVA, NGEMC, Georgia Power, Oglethorpe Power, a city, a county, or the State decides to take your land in a condemnation process, you are entitled to just compensation. Just compensation is rarely achieved on the first offer from the condemning authority.

Landowner rights: If you are a landowner, if you own commercial, residential, or farm property that the DOT, Georgia Power, Oglethorpe Power, TVA, NGEMC or the government requires, speak to an attorney to protect your rights.

Condemnation proceedings: When your land or other real property is subject to a condemnation proceeding to make way for other uses (an interstate highway, a power line right-of-way, or other public uses), an attorney can help you determine an appropriate response.


Similar to the proposed Catoosa substation and transmission project, Georgia Power has a project in the Gainesville area, for which the right of eminent domain may be exercised.

Public meeting event information →

Georgia Power will hold public meetings, as required by O.C.G.A. 22-3-160.1, at the following times and place: Wednesday, September 24, 2014 from 2:00 PM to 4:00 PM and 6:00 PM to 7:30 PM Location: Brenau University Downtown Center 301 Main Street, SW Gainesville, Georgia, 30501

Read more: Georgia Press Association Public Notice Website (Archived) – Miscellaneous →


Pylon cable riggers dismantling reel” by User:Sandpiper – taken by contributor. Licensed under Public domain via Wikimedia Commons.

Questions about proposed substation

What is the scale (kilovoltage) of this project? How, when and where can the public view the ancillary planning documents related to this project?

Where is the power coming from? Where is it going to?

What is the project’s preferred path? What alternatives have been considered? It appears this is a westward extension of the transmission line from the West Ringgold substation on Alabama Highway, which currently ends at the county landfill. Clear cuts on Davis Ridge and along Three Notch Rd indicate a possible path.

west-ringgold-to-davis-ridge
West Ringgold Substation distribution line path

Does this proposal require the use of eminent domain in order to acquire any right-of-way for this project? How many landowners or homeowners will be impacted by the use of eminent domain, what specific lands would be acquired and where are they located?


How has safe, renewable energy  been factored into the mix for this expansion of the electric grid?

How would residents and property owners be protected from impacts to property values, property use, human health, environment, scenery, traffic congestion and other concerns?

Why does this area require a new substation and new transmission lines? Why can’t the substation be located at an industrial park? Why bring in power from other areas, when existing North Georgia Electric Membership Cooperative providers, electric infrastructure, corridors and lines  could be used?

Oglethorpe Power recently brought 2 large plants online: Hammond (Rome) and Smith (Dalton).  NGEMC has purchased power from TVA up to this point. Is this a move by Oglethorpe to expand its member system? Is NGEMC planning to switch from TVA to Oglethorpe as a provider?

We recognize that the country’s power grid is 50 years behind where it should be. How can we be sure this project is urgently needed and that it would be planned and executed in the best possible way?


The large residential and industrial areas this substation would serve are located on or over the Walker county line. Why can’t this substation be sited in Walker county? Why can’t it be located in an existing industrial zone, or abandoned/unproductive agricultural land? Why can’t transmission lines use the existing corridors?

Electricity Generation & Distribution Map (itoworld.com) →

screen-shot 2014-09-10 at 12.52.19 PM
Unproductive agricultural land with existing transmission/distribution ROW

The citizens of this immediate area have often objected to rezoning, inappropriate development, and inadequate infrastructure planning, but the county and state have (just as often) brushed off these objections. Politicians and officials have stated property values would remain steady, taxes would not increase, and infrastructure would be sufficient to support new development. Why should citizens believe the state and county governments?

This area is one of the last remaining sections of the county with large areas of productive farmland and pasture. If a substation is built, will it lead to rapid suburban development? Will there be large transmission towers and lines leading in all directions?

Why should citizens accept yet  another assault on their cultural and property values? Why should they believe the politicians and officials who are supporting this project?

screen-shot 2014-09-10 at 12.59.42 PM
Industrial site with existing transmission/distribution ROW

Why is this facility not planned for location on existing powerlines (expansion) or power corridors (co-location)? Why not choose an industrial location, or abandoned/unused agricultural parcels, instead of ruining prime, productive farmland and impacting a beautiful rural landscape?


With the nearby sinkholes and springs, how can the proposed site be stable and safe enough to support such a large facility? How can the state and utilities guarantee there will never be groundwater pollution, or further impairment to Chickamauga Creek, from an accident at the facility?

screen-shot 2014-09-10 at 2.41.25 PM
Area proposed for substation and new transmission/transfer facilities: prime, productive farmland mixed with residential. Springs, groundwater, and surface lakes.

The roads in this area are not capable of handling additional traffic, and are not safe for motorists, pedestrians or cyclists. This area has seen too much sprawling residential development in the past, and it does not have the sidewalks, turning lanes, drainage or other amenities and infrastructure to handle additional development.


Economics may lead to this project failing to get built, or being unnecessary.  Walker County wants to develop a huge industrial park, and more residential zones in Rock Spring and Kensington. They are now asking to raise citizens’ taxes, while simultaneously offering real estate and tax incentives to prospective employers and developers.

What proposed or planned development is contingent upon this new infrastructure? Who stands to financially benefit from the project (power producers, contractors and/or developers)?

Why should Catoosa citizens bear the external cost of this project? Will Catoosa and the state be hunting for tax increases as well? Why should current residents, landowners and citizens pay the bills for economic speculation by the counties and the state?


Image: Electricity Sub-Station; Sub-Station south of Maybole with transmission line running to the east

© Copyright Mary and Angus Hogg and licensed for reuse under this Creative Commons Licence.